Anyone who has been in our chapel knows that the tabernacle looks like this:
But during the Fortnight for Freedom, we would like it to look like this:
To do that, to expose the Eucharist in the Monstrance, we need to make certain there is someone in the chapel every hour between 9 a.m. and 9 p.m. starting June 21st. If you can commit an hour to help, please sign up here. If someone is signed up during the hour that woul work for them, know that you can come and pray too.
Showing posts with label Chapel. Show all posts
Showing posts with label Chapel. Show all posts
Saturday, June 15, 2013
Saturday, February 2, 2013
Preparing
The baptismal font may not look any different from last weekend, but underneath the work is progressing. It should be ready for use on Wednesday.
Here's a little peek to give an indication of what the base will look like.
Today the doors of the tabernacle are open, anxious to receive the Eucharist for the first time.
After communion, there will be a Eucharistic Procession ending with the arrival of the Eucharist in this tabernacle.
That also means that the Adoration Chapel will soon be open for silent prayer.
Here's a little peek to give an indication of what the base will look like.
Today the doors of the tabernacle are open, anxious to receive the Eucharist for the first time.
After communion, there will be a Eucharistic Procession ending with the arrival of the Eucharist in this tabernacle.
That also means that the Adoration Chapel will soon be open for silent prayer.
Monday, January 28, 2013
Inspected
Above Jess Long from Boyd Jones Construction presented Fr. Damian with the Certificate of Occupancy from the City of Papillion and let him know that the Fire Marshall has approved the new chapel and sacristy for use.
Archbishop Lucas has advised us that when we move the Eucharist to the new tabernacle it ought to be done within a Eucharistic Procession when many of the faithful can be in attendance. The plan is to close the 5 p.m. Mass on Saturday with that Eucharistic Procession. This means that the chapel will be used for private, silent Eucharistic Adoration starting around 6 p.m. on Saturday.
Archbishop Lucas has advised us that when we move the Eucharist to the new tabernacle it ought to be done within a Eucharistic Procession when many of the faithful can be in attendance. The plan is to close the 5 p.m. Mass on Saturday with that Eucharistic Procession. This means that the chapel will be used for private, silent Eucharistic Adoration starting around 6 p.m. on Saturday.
Wednesday, January 16, 2013
Installing the Old Stained Glass
After 30 years in the basement, they were cleaned up
Now it's time to install two of those sets (four windows) in the new chapel.
The two panels to the right are of Jesus, with His disciples, beginning his ascension as he gives our parish mission statement, "Go and Make Disciples."
The two to the left are of Jesus praying in the Garden of Gethsemane, “My Father, if it is possible, let this cup pass from me; yet not what I want but what you want.” Meanwhile the angel is there with the "cup."
Friday, January 11, 2013
Finished Shingling
This week the shingling was
completed for the Adoration Chapel.
The shingles used when the church was built
thirty years ago are no longer made.
But it turned out that we have enough left over from that original project to complete the chapel. Bill Heese, our Maintenance Coordinator, said, "There's been a pile of the shingles in the corner for year. They never got in my way so I left them there."
Since they haven't had any wear, these shingles look slightly different in color, but that difference should be less in time.
Thursday, January 3, 2013
Bringing in the Light
Work on the chapel continues. This morning
there was progress on the window.
It is much brighter now.
In the next week or so, stained glass panels from our previous church will be inside the clear panes. But even with this step done, it allows the construction to move forward in the chapel.
Wednesday, December 19, 2012
Pictures from Today
A new door was added this morning.
Installing glass panels.
The tabernacle will be in the center.
Working inside the chapel.
The new ambo arrived.
Labels:
ambo,
Chapel,
Construction,
Source and Summit,
St. Columbkille Parish
The snow won't slow us down but...
We have been blessed by great
weather during construction this year.
Earlier this week we were informed that the metal frame which will hold a clear, glass window (as well as four stained glass windows from the previous church) is not done. Until that is installed, much of the interior work of the chapel can not be done.
So for now it is sealed and what
can be done will be done.
Fr. Vogel is among those of us who can't wait!
(Behind Fr. Vogel is the chapel side of what will become the tabernacle.)