The railings are up for the steps
 in our new parking lot. 

Enjoy!

Sunday, November 8, 2015

The Pastor's Challenge

From Fr. Dave:

Last week I introduced my "Pastor’s Challenge". I would be delighted if we could turn “Pave the Way” into “Paid the Way”. The sooner we pay off the loan, the more interest money we will save and the sooner we can move on to Phase III.

This "challenge" is twofold. First - I would like to encourage members of our parish to join me in making little sacrifices to save money and contribute each month by putting your savings in the “Pave the Way” envelopes provided in your monthly packet.

Fr. Damian suggested that we each contribute what we might spend each month for parking at sporting events or concerts at the CenturyLink Center. This is a great idea. In essence, if many of our 3,000+ families each made a contribution, we would go a long way toward paying off Phase II.

Secondly, I will personally match the largest donation to “Pave the Way” that is made (before December 31st) up to $10,000.00. I want to be a part of the success of this project and thank all of you in advance for your tremendously generous support.

Pax,
Fr Dave

Sunday, November 1, 2015

Halloween Prank?

Did someone steal our stairs as a Halloween Prank?

It did happen on Halloween, but it wasn't a prank. If you walked this set of stairs, you may have noticed that the angle of the steps were off on the top two and they weren't even. So the contractors pulled it out and will re-pour the steps. They want everything to be perfect.

Wednesday, October 21, 2015

It's Not Done But...

The new parking will be washed off with a fire hose on Friday, there's more landscaping to do, we're waiting for the permanent hand rails as well as a few other things. So it's not done yet, but they're letting us park on it now. Not Friday (while the fire hose is here), but we can today.


Saturday, September 5, 2015

Pouring Concrete

During Phase Two of our Pave the Way project, there are four large concrete pours. The first of those was scheduled for yesterday, but they were prepared and did it Thursday instead.

 The sensor above ...

 ... is on this machine ...

 ... and reads a signal from this stationary laser signal ...

... so this computer can make certain the level of concrete is at the exact right height in all of the parking lot.

About 35 trucks were used, arriving 
every 12 minutes full of concrete.

Despite the GPS and computer equipment, a lot of getting the concrete in place remains a work of art.


Tuesday, September 1, 2015

We Have Power

Above is a picture before the electricity was turned off in our Parish Office. Below you can see the difference as there are no longer overhead lines going to the office and the poles have been removed.


Here's a picture from just before the work began. You can see the sleeve which the new lines would travel through underground to replace the overhead lines.

With the posts out of the way, the hill has been cleaned up so work can begin to build a retaining wall. The workers are anxious to start pouring concrete.


Wednesday, August 26, 2015

Construction Continues

For our Pave the Way project, 
work continues on our second phase. 

Brick on the south side of this 
building will match the church.

One of the first steps is calculating
where the future light poles will go.

Weather permitting, we'll start to see some
 concrete on the ground starting next week.


Saturday, August 1, 2015

The View From the Steps

From the north door of the church, we've always needed these steps to get to the north parking lot. Recently, the view from these steps has changed as the Pave the Way project has progressed.

Now those steps are gone.

Wednesday, April 8, 2015

Office Construction Continues

Fr Damian has been in to see how construction on the new office has been coming along.

 Here's a previous picture of one of the offices...

 ... and the current view.

 This is in the reception area which was an addition.

This will be the new conference room.

 These shelves/cabinets from the current office have been removed ...

... and are being installed in the new office building.

Everything is coming along very well.